Gas Gathering System Replacement Analysis

GTS provided a conceptual design and associated cost estimate replacing the Rio Vista Gas Gathering System in California. The cost estimate was used to support negotiations for purchasing the existing system from PG&E. The conceptual design consisted of pipeline, dehydration, and compression facilities to gather approximately 50 MMscf/d of natural gas production.