Storage - Lodi

Project Description
Lodi Gas Storage (LGS) was experiencing liquid production and slugging from new wells at their Kirby Hills Gas Storage facility. LGS had implemented a temporary solution, but required a permanent solution to be engineered, installed, and operational in time for the start of the summer withdrawal season.

GTS Involvement
GTS was selected by LGS to provide engineering and construction management services for the project. GTS was responsible for the detailed engineering design, including preparing drawings, material and construction specifications, and bid solicitation, and providing construction oversight and commissioning.

Project Photos